Front Walkway

Front walkway removal and concrete paver installation
Fall 2005

a before shot

another before shot

panorama during construction

excavation showing conduit for the low voltage wiring

gravel compacted and planter under construction

night shot of paver installation. Most of the pavers installed

pavers complete

new columns in place (Waynengineered)

another shot of the new columns