The main component of the patio resurfacing was Navastone Tuscanni
Stone Tile. The sitting wall was constructed
with EP Henry 3" Coventry Wall, Autumn Blend block.
A soldier course of the Coventry Autumn blend was also installed.
The step and sitting wall were capped with Blue Stone (natural slate). The contractor extended the existing rectangular concrete
patio by excavating, compacting crushed stone, and pouring concrete to match the curved shape. The Stone Tiles were set in a mortar
bed.
Construction day 1 was sunny and 70 degrees. By Wednesday, it was 40ish and windy.