Front walkway removal and concrete paver installation
Fall 2005
 a before shot |
 another before shot |
 panorama during construction |
 excavation showing conduit for the low voltage wiring |
 gravel compacted and planter under construction |
 night shot of paver installation. Most of the pavers installed |
 pavers complete |
 new columns in place (Waynengineered) |
 another shot of the new columns |