Front walkway removal and concrete paver installation
Fall 2005

a before shot


another before shot


panorama during construction


excavation showing conduit for the low voltage wiring


gravel compacted and planter under construction


night shot of paver installation. Most of the pavers installed


pavers complete


new columns in place (Waynengineered)


another shot of the new columns